Boatsmith Shavings
Sunday, April 8, 2012

Trim and TV

›
We have started fabricating the teak trim for the Liberty interior. Below is the bed fiddle. Here is the starboard side cantilevered table....
Friday, January 6, 2012

Tripanel and Veneer

›
The interiors of the Liberty Yachts are built of Tri Cell Panels. This is a very light weight,stable material. It is 1.5 mm of Okoume plyon ...
Saturday, December 31, 2011

First Fiberglass Ariki Hull

›
With the mold well waxed we put a sheet of plastic over it to fit our fabric.  Below we have sprayed the mold with PVA, a mold release co...
Monday, December 26, 2011

Liberty Yachts Revisited Yacht Interior

›
Liberty Yachts closed their doors in 2009.  But Bill and Linda who we built the interior for on "Lidda" (Liberty #18) really like ...
Tuesday, November 22, 2011

Waxing Ariki Catamaran Mold

›
Well we sanded and sanded and then we glassed the inside of the mold to stabilize it. We went from a period of moderate humidity to our norm...
Saturday, October 22, 2011

Sand and Sand and Sand.......

›
.People say that when you tweak a design that you will cause yourself much work downstream. I'm here to tell you that that be the truth ...
Saturday, September 3, 2011

Wharram Fiberglass Ariki Catamaran

›
We have a contract to build a new catamaran for a fellow here in FL. He decided that he wanted an Ariki. This is a 45' classic design fr...
1 comment:
›
Home
View web version
Powered by Blogger.